![]() ![]() obtained from post-dredging seasonal report from the City of Long Beach to USACE. Approximately 350,000 cy will be dredged from Harbor channels (Brewerton Angle) and placed at the Cox Creek Dredged Material Containment Facility. BASELINE CONDITIONS (F3) REPORT TECHNICAL APPENDIX. The US Army Corps of Engineers Philadelphia District (CENAP) is the agency responsible nationwide for dredging navigation channels, including the Chesapeake. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 1,100,000 cy will be dredged from the Maryland approach channels (Tolchester Channel, Brewerton Channel Eastern Extension, and Craighill Angle) and placed at the Paul S. The dredging depth varies by channel segment and ranges from 35 feet mean lower low water (ft MLLW) to 50 ft MLLW with an additional 1 foot of allowable overdepth. ![]() The project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. Work is expected to be completed by September 9, 2023. Bids for the project were solicited via the internet with four received. Army Corps of Engineers' Baltimore District. The $23,963,300 firm-fixed-price contract was awarded by the U.S. dredging contractor Cashman Dredging & Marine Contracting has been awarded a contract for maintenance dredging in Baltimore. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |